GT13E2 Rotor Repair & Overhaul — Independent Service for ABB / Alstom GT13E2
ZURN Power performs independent repair and overhaul of ABB / Alstom GT13E2 turbine rotors: incoming condition report, blade replacement, root and journal restoration, coating renewal and certified dynamic balancing. Typical shop time 10–16 weeks, scheduled to your outage window rather than an OEM production slot.
GT13E2 rotor repair scope
| Work scope | Description | Typical duration |
|---|---|---|
| Incoming inspection & condition report | Dimensional survey, NDT (UT / MT / PT / EC), material spectrometry, coating thickness mapping, full photographic record | 1–2 weeks |
| Blade replacement | Removal of damaged blades, supply and fitment of new cast blades (IN738LC / IN738 / Mar-M247) to OEM clearance | 6–10 weeks |
| Root / fir-tree restoration | Machining or weld build-up of worn blade roots and disc slots, then re-machining to drawing | 3–5 weeks |
| Journal & sealing surface repair | Weld build-up, machining and grinding of journals, seal lands and balancing planes | 2–4 weeks |
| Coating renewal | Strip of degraded aluminide / MCrAlY, re-coating and diffusion heat treatment | 3–5 weeks |
| Dynamic balancing | Low- and high-speed balancing to ISO 21940 / OEM tolerance, with certified report | 1 week |
| Final documentation | Repair record, material certificates, NDT reports, balancing certificate, dimensional report | Included |
Why operators use independent rotor repair
OEM rotor programmes are quoted on the OEM's production calendar, not on your outage window. An independent route gives you three practical advantages:
- Schedule control — the rotor enters our shop when your outage plan requires it, not when a slot opens.
- Scope control — you pay for the stages that are actually damaged. Partial blade replacement and localised root repair are quoted separately instead of a full rotor replacement.
- Documentation parity — EN 10204 3.1 / 3.2, NDT records and balancing certificates issued to the same standards the OEM would supply.
Repair scope is always agreed against the incoming condition report before any work starts, so there is no open-ended cost.
Request a rotor repair quotation
Get a quotation within 48 hours
Send the model, part number, drawing or BOM and required quantity. You receive scope, material certification, lead time and price — no OEM authorization needed.
Frequently Asked Questions
Can you repair a GT13E2 rotor without the OEM drawing?
Yes. The rotor is dimensionally surveyed on arrival and the repair geometry is reconstructed from the undamaged stages and from the component itself. Drawings produced for repair are submitted to you for approval before machining.
How long does a GT13E2 rotor overhaul take?
Typical shop time is 10–16 weeks depending on scope: inspection 1–2 weeks, blade supply and fitment 6–10 weeks, balancing and documentation 1–2 weeks. Outage-driven jobs can be fast-tracked.
What certification do we receive after the repair?
A full repair dossier: incoming condition report, material certificates for all replacement parts (EN 10204 3.1, or 3.2 with third-party witness), NDT reports, heat treatment records, dimensional report and the dynamic balancing certificate to ISO 21940.
Do you handle logistics from site?
We coordinate collection, export packing, customs documentation and return shipping under EXW, FCA, FOB, CIF or DAP terms. Rotors are packed in sealed, nitrogen-flushed or VCI-protected crates with shock and tilt indicators.
ABB / Alstom Gas Turbine Family — All 12 Models We Support
Dedicated spare parts, repair and technical support pages for every model of the ABB / Alstom heavy-duty fleet: